George Washington Bridge Bus Terminal
Contracted by the prime architect, STV Inc., FSC performed production work on the construction documents, as well as a large portion of the ongoing engineering that is common post-construction.
The client was so satisfied with the work that they asked permission to directly hire an FSC team member. As of this writing, this person still works for STV and serves as an example of how deep this 20+ year working relationship runs.
Share
Date:
January 29, 2016
Client:
STV Inc.